Additional documents of interest
- Successful Business Continuity - Part 1 - Users and Groups
-
This article was published in the April 2005 issue of
AIX Update magazine
and discusses system administration needs and requirements oriented
around users and groups. The overall emphasis of this series of
articles is for implementation of enterprise wide unique identifiers
for a variety of parameters, such as user names, group names, UID and
GID numbers.
- Successful Business Continuity - Part 2 - Machine and Host Names
-
This article was published in the May 2005 issue of
AIX Update magazine
and discusses naming structures for machines, systems, adapters, and
aliases. The overall emphasis of this series of articles is for
implementation of enterprise wide unique identifiers for a variety of
parameters.
- Successful Business Continuity - Part 3 - Volume Names
-
This article was published in the December 2005 issue of
AIX Update magazine
and discusses naming structures for volume groups, logical volumes, log
logical volumes, directory mount points, etc. The overall emphasis of
this series of articles is for implementation of enterprise wide unique
identifiers for a variety of parameters.
- Successful Business Continuity - Part 4 - MQ Series, Startup/Shutdown Scripts, Error Processing
-
This article was published in the April 2006 issue of
AIX Update magazine
and discusses how to implement AIX in an environment dedicated to
business continuity. The topic of this article is the assignment of MQ
Series queue names and aliases, resource group startup and shutdown
script names (Application startup/shutdown script names), error logging,
and error notification.
- Successful Business Continuity - Part 5 - Miscellaneous topics
-
This article was published in the August 2006 issue of
AIX Update magazine
and discusses how to implement AIX in an environment dedicated to
business continuity. A variety of topics is discussed in this article
including automated documentation generation and management.
- Automated Microcode Management System
-
One of the most difficult administration tasks in an AIX environment is
attempting to keep the firmware and microcode up-to-date. Mt Xia has
devised an automated method of gathering the Microcode information,
determining which microcode needs to be updated, generating reports, and
uploading the required microcode updates to each individual system.
- Calculating the size of a Virtual Processor
-
This document describes the algorithms used to calculate the size of a
virtual processor when using shared processors in an LPAR. The IBM
documentation describes how to calculate CPU utilization, NOT how to
size for configuration, this document clarifies this process. A
description of the HMC input fields for the processor tab is included.
- Basics of Partition Load Manager Setup
-
This presentation was provided by Ron Barker from IBM regarding the PLM Basic
setup.
- ppt
- pdf
|
|
|
|
|
Special Interest Topics:
During a Disaster Recovery (DR) implementation effort, the last
thing you want is unexpected hardware and software configuration issues.
These tend to consume time, resources, and cause Recovery Time
Objectives (RTO) to be missed. In order to ensure business continuity,
organizations must design, implement, maintain and enforce policies,
procedures, standards, and guidelines that encompass all aspects of
their critical business functions.
A successful DR effort is not only dependent upon a well thought-out
DR plan; it must have been derived from an enterprise wide mentality of
business continuity. Furthermore, business continuity must be the
beginning point in systems design, not the ending point. Unfortunately,
very few systems are built starting from the business continuity
perspective and working backwards.
The documentation referenced here describes the policies,
guidelines, standards and procedures for insuring business continuity
for the business functions supported using IBM's Power 5 architecture.
This architecture supports the ability to provide capacity on-demand and
virtual I/O. The ability to micro-partition using pieces of a processor
and dynamically allocate and deallocate memory is supported in this
environment as well.
The Power 5 architecture provides the ability to define LPAR's and
Virtual LPAR's. The difference between an LPAR and a Virtual LPAR is
the implementation of the virtualization features. The Power 5
architecture allows the sytem administrator to configure logical
partitions with dedicated resources such as processors, memory, and I/O
adapters. The system administrator may also configure logical
partitions utilizing shared processors, memory, and virtualized I/O
adapters. The virtual I/O adapters are configured and made available to
the LPAR's via the VIO server. The VIO server provides the ability to
reduce the number of adapters required to support multiple LPAR's by
virtualizing the hardware and allowing multiple LPAR's to share the same
hardware I/O adapters.
|
|
|
|
|
|
|